# AranVision — Replacement delta sheet

**Blank planning template — not a compatibility approval or an authorization to perform work.**

Project reference: __________________  Date: __________________

Existing drive / exact catalogue reference: __________________

Proposed drive / exact catalogue reference: __________________

Application and reason for replacement: __________________

Required date / planned change window: __________________

| Review boundary | Existing condition / document reference | Proposed condition / document reference | Gap or evidence still needed | Responsible person / due date |
|---|---|---|---|---|
| Motor, load and duty | | | | |
| Supply and installation conditions | | | | |
| Physical fit and environment | | | | |
| Commands and control interface | | | | |
| Feedback, communications and configuration | | | | |
| Safety-related functions and qualified reviewer | | | | |
| Configuration backup / recovery approach | | | | |
| Acceptance criteria and handover records | | | | |

## Commercial boundary

Equipment supply included: __________________

Technical review / configuration / installation / validation included: __________________

Explicit exclusions and assumptions: __________________

Open decisions preventing compatibility confirmation: __________________

Technical selection owner: __________________

Changeover and acceptance owners: __________________

**Status:** Not reviewed / Review in progress / Further evidence required / Review outcome documented

Record the actual review outcome and its authorizing document separately. A completed form does not certify compatibility, authorize energization or replace model-specific instructions, qualified assessment or the site's change-control process. Do not include passwords, access credentials or unnecessary confidential plant information.