Prepare a controls change window

Align operations, controls and IT on the boundary, rollback trigger and handover.

Build the project brief
Controls backup and recovery planning diagram

Preparation sequence

  1. Describe the approved change and what must remain unchanged.
  2. Agree personnel, permitted access, production window and stop conditions.
  3. Identify the known-good baseline and an authorized rollback procedure.
  4. Record post-change checks, deviations and the handover decision.