Essential functionality — always available
Needed for security, accounts and requested services.

Industrial automation & controls · Toronto · GTA

EPLAN & electrical design services

EPLAN electrical drawings, wiring diagrams & panel layouts.

EPLAN drawings, wiring diagrams, 2D/3D panel layouts and BOM documentation for OEMs and panel builders in Toronto, the GTA and Ontario.

Specialist electrical documentation

One coordinated package.
Drawings, layout and BOM.

EPLAN electrical CAD drafting and control-panel documentation for OEMs, panel builders and industrial facilities in Toronto, the GTA and Ontario. Remote drafting support is available by arrangement for new machines, retrofits and as-built drawing updates.

EPLANElectric P8 · Pro PanelSoftware platforms used for the agreed work package.

EPLAN Data Portal

Bring manufacturer data into the package.

Data Portal supplies device information, schematic macros, 2D/3D graphics and document links. These records can support parts management, schematic development and cabinet layout.

Explore the official EPLAN Data Portal overview ↗

Review the data against the actual project.

We confirm the required model and revision, available component data and client standards. A portal record does not establish stock, suitability, approval or the exact device installed on site. Access, software version and required modules are confirmed for each work package.

AranVision service scope

Choose a complete package or a defined drawing task.

Electrical CAD design & drafting

Power and control schematics, single-line drawings, PLC interfaces and consistent device identification.

Wiring diagrams & terminal plans

Wire numbering, connection references, terminal-strip diagrams, cable schedules and field-interface documentation.

2D & 3D panel layouts

Mounting-plate and door arrangements, device placement, service access and enclosure coordination.

BOM & device-data review

Manufacturer, complete part number, quantity, accessories and document references tied to the drawing revision.

As-built drawings & revision updates

Project structure, title blocks, agreed macros, drawing conventions, field redlines and controlled revision records.

Panel-builder handover

Review PDFs, agreed editable projects and checked reports; manufacturing data only in the confirmed scope and format.

View illustrative documentation concepts

These simplified AranVision illustrations explain the relationship between drawings, layout and material records. They are not EPLAN application screenshots or construction documents.

Illustrative motor-control drawing with device tags, wire references, terminals and a PLC interface
Illustrative example · not an EPLAN application screenshot or a customer project
01

Electrical schematics & wiring diagrams

Power and control circuits, device tags, wire numbering, terminal plans, cable schedules and PLC I/O references.

Illustrative front-view panel layout showing DIN rails, cable ducts, control devices and terminal blocks
Illustrative example · not an EPLAN application screenshot or a customer project
02

2D panel layout & enclosure coordination

Mounting-plate arrangement, DIN rails, cable ducts, device placement, door layout and service-access review.

Illustrative isometric control-panel arrangement with enclosure, mounting plate, cable ducts and devices
Illustrative example · not an EPLAN application screenshot or a customer project
03

3D panel layout & build coordination

EPLAN Pro Panel work packages for spatial coordination, component placement and routing preparation, with model data and required modules agreed at kickoff.

Beyond the drawing sheet

Bill of materials, reports & handover

Connect the device shown on a drawing to its location, terminal reference and material record. Changes should remain traceable across the package.

  • Bill of materials (BOM) — manufacturer, full part number, description, quantity and revision basis; availability and substitutions require separate confirmation.
  • Connection documentation — terminal strips, cable and wire lists, PLC I/O schedules and cross-references.
  • Controlled drawing updates — existing drawings, field redlines, revision records and as-built updates against verified field information.
  • Agreed delivery formats — review PDFs, editable project files and agreed reports/exports, with software version and client standards confirmed before work starts.

From brief to handover

A reviewable workflow, with clear release points.

  1. 01 · Define

    Agree the system boundary, client standards, source drawings, EPLAN version and required deliverables.

  2. 02 · Develop

    Coordinate device tags, schematics, layout and material records; log assumptions and missing information.

  3. 03 · Review

    Resolve drawing comments with the client and panel builder. Check interfaces and report consistency before release.

  4. 04 · Hand over

    Release the agreed revision and formats, with open items and a controlled route for verified as-built updates.

Start with the package you need.

Send the panel or machine purpose, drawing status, preferred EPLAN version and required outputs. We confirm inputs, responsibilities, review stages and scope before quoting.

Discuss an EPLAN project

EPLAN is a trademark of its respective owner. AranVision is an independent service provider; displaying the software brand does not claim EPLAN partnership, certification or endorsement. Regulated engineering and approvals follow the responsibility boundary stated below.

Delivery approach

Work that can be reviewed, tested and handed over.

A strong drawing package connects control intent to fabrication, wiring, checkout and maintenance. AranVision develops coordinated electrical documentation with practical attention to interfaces, protection, serviceability and revision control.

EPLAN Electric P8EPLAN Pro PanelAutoCAD ElectricalSolidWorks Electrical2D / 3D panel layoutsBill of materials

Scope clarity

What a useful work package needs to establish.

The drawing package is treated as one coordinated dataset rather than a collection of independent sheets. Device identifiers, wire numbers, terminal assignments, PLC addresses and bill-of-material entries are checked across the package. Power, control, safety and communications are separated clearly enough for fabrication, inspection and field troubleshooting.

Component selection and layout review consider the available fault information, protection approach, conductor and terminal needs, grounding and bonding, heat, environmental conditions, service access and field wiring. Final authority, certification and inspection responsibilities remain defined by the project jurisdiction and contracting structure.

Every engagement begins with a written boundary for access, production impact, client-supplied information, approvals and third-party responsibilities. Recommendations are tied to the evidence available at the time. If field discovery changes a critical assumption, the effect on scope, testing and acceptance is reviewed before the work proceeds.

Project readiness

Fit, inputs and acceptance before work starts.

These checkpoints keep responsibilities visible and prevent important interfaces from becoming late-stage surprises.

01

Best-fit assignments

  • A new or retrofit controls package that needs implementation-ready electrical documentation
  • An OEM or panel shop that needs EPLAN, SolidWorks Electrical or AutoCAD documentation and design support
  • An installed panel requiring controlled redlines, normalization or as-built documentation
02

Inputs to provide

  • Supply characteristics, loads, architecture, I/O, enclosure environment and interfaces
  • Client drafting rules, preferred components, applicable codes and approval path
  • Existing drawings, field redlines, short-circuit information and panel-shop responsibilities
03

Acceptance evidence

  • Cross-checked schematics, I/O, terminals, cables, BOM and panel layout
  • Recorded design assumptions, exclusions and review comments
  • Released revision plus controlled redline and as-built workflow

Project outcomes

What the engagement is designed to improve.

Scope boundary

Programming, controls documentation, integration, testing and commissioning support are delivered within the agreed responsibility matrix. Any regulated professional engineering, electrical contracting, panel certification or authority approval is identified separately and assigned to the appropriately licensed or authorized party.

Typical deliverables

A defined package with clear technical outputs.

The final scope is adjusted to the installed system, project stage, client standards and site responsibilities.

01

EPLAN electrical schematics, wiring diagrams and single-line diagrams

02

2D panel layouts, 3D layout support and enclosure coordination

03

I/O, terminal and cable documentation

04

Coordinated bill of materials with manufacturer and full part number

05

Power-distribution and protection review inputs

06

Redlines and as-built drawing updates

Delivery method

Three decisions that keep controls work under control.

01

Confirm requirements

Review supply, loads, control architecture, interfaces, environment, applicable standards and client documentation rules.

02

Coordinate the package

Align schematics, I/O, terminals, cables, BOM and panel layout so each deliverable tells the same story.

03

Review for buildability

Check clearances, service access, separation, field wiring and test points before release.

Common questions

Questions to settle before kickoff.

Can you work from existing drawings and field redlines?

Yes. Existing packages can be reviewed, normalized and updated into a controlled drawing set for retrofit or as-built use.

What is the difference between Electric P8 and Pro Panel?

Electric P8 supports electrical schematics and project reports. Pro Panel adds three-dimensional cabinet layout and related routing and manufacturing data. We confirm the necessary version, modules and component data before agreeing the deliverables.

Can we request only drawings, a BOM or a panel-layout update?

Yes. A defined task can cover an electrical drawing set, connection schedules, a BOM review, a 2D layout or a 3D coordination package. We establish the source information and review boundary so a partial assignment does not imply approval of the entire installation.

What should we provide for an EPLAN quotation?

Describe the machine or panel, the current drawing status, preferred software version, required outputs and target date. Existing drawings, component lists, I/O schedules, client templates and non-confidential reference images help define the work. Final file exchange and any confidential project records use the agreed private channel.

Do you manufacture panels?

AranVision focuses on controls documentation and design support and can coordinate defined review and commissioning packages with a client-selected panel shop or licensed electrical contractor. Fabrication, certification and installation responsibilities are identified in the project scope.

Next step

Send the system type, current issue, location and target date.

Discuss Your Project