Industrial automation & controls · Toronto · GTA
← Back to engineering tools

Engineering toolbox

Standards reference
& project screening.

Compare documented values, find mismatches and prepare evidence for a qualified Ontario panel or installation review.

Check your project data

Ontario preliminary screening · AV-ON-SCREEN-1.0. No overall “compliant” score. Enter documented values; leave unknown values blank. Inputs stay in this page until you download them. Reloading clears them.

Not evaluated. Enter data and run the checks. Editing inputs invalidates the previous result.

Official reference library

Publisher links and original summaries, not copied standards. Only the screening checks above are automated; ISO/IEC construction and safety requirements remain reference-only. Verify applicable editions and amendments for the project date.

UL — SCCR for machinery ↗

Public guidance discussing NFPA 79:2021; not an Ontario code determination

Compare documented assembly SCCR with available fault current at its supply point. This tool does not derive an assembly SCCR from a parts list.

NEMA enclosure type descriptions ↗

Public enclosure-type guide; confirm current product certification

Preliminary exposure screening only. No IP-to-Type conversion, chemical resistance, hygiene or hot/high-pressure wash approval is inferred.

ISO 13849-1 ↗

2023

Safety-related control systems. Reference-only: no PL, PLr, category or machine safety validation is calculated.

IEC official standards catalogue ↗

Select the applicable IEC 60204-1 / IEC 60529 edition

Official access to machine electrical equipment and enclosure-protection standards. Reference-only, not automated.

Additional planning prompts — panels, machines and international projects

Start with the right reference area

Select the area most relevant to your idea. Answering “yes” is not evidence of compliance; it simply identifies where a professional review can start.

UL 508A planning topics

Industrial control panel

Official scope reference ↗
1. Is the intended panel scope and end-use environment documented?
2. Are component ratings, power distribution and available fault information identified?
3. Is there a plan for drawings, labels, wiring records and inspection evidence?

Planning outcome

These items should be clarified before treating the idea as ready for detailed engineering or approval.

  • Is the intended panel scope and end-use environment documented?
  • Are component ratings, power distribution and available fault information identified?
  • Is there a plan for drawings, labels, wiring records and inspection evidence?
Discuss project review requirements

Opening the email is your choice; the checklist does not transmit answers automatically.

What this does not do

It does not reproduce standards, determine legal requirements, establish compliance, calculate safety performance, certify a panel or replace the authority having jurisdiction. Use the current licensed standard, equipment information and qualified review for project decisions.

Essential functionality — always available
Needed for security, accounts and requested services.